The first impression from your home or office largely depends on the hall – room, where you find yourself and your guests, barely having crossed the threshold of the front door. It has present itself not only as a beautiful, but also a convenient place: so that without turmoil, it was possible to take off the outer clothing and shoes. What designer furniture in the hallway is able to ensure compliance with these conditions?

... Read more
SS005137
LISBON Shoe Cabinet Storage
35 719

LISBON Shoe Cabinet Storage

SS004505
LYON Shoe Cabinet Storage
24 879

Compact LYON Shoe Cabinet will help to maintain order in the entrance area, even if there is not much space. Four boxes are equipped with a special storage system – folding shelves, where you can gently fold shoes, slippers, sneakers and other short-shafted shoes. Thanks to this technological solution, you will avoid cluttering the hallway. Two drawers on metal guides are designed for storing various accessories and shoecare products. The Shoe Cabinet is made of natural wood (pine) and painted with safe water-based paints. The tabletop is impregnated with a toning agent, the colour of which is in harmony with the main light tone. The facade of the cabinet is decorated with a relief geometric pattern and cornices (upper and lower). Boxes are made of plywood. If the item is out...

SS004380
VATRA Entrance Hall
12 649
15 179

What is required in the entrance area first of all? Hooks for clothes, a shelf for hats, a niche for footwear and, ideally, a bench where you can sit down. VATRA Entrance Hall combines all of these features at rather small sizes, so it is perfect even for small spaces. Like other items from the same collection, it is made of pine boards processed according to firing technology. M8 bolts with a round hat with a diameter of 20 mm are used as hooks. There are quite many of them so there will be enough to hang your coats, jackets and fur coats. Thanks to the welded metal structures you do not need to be afraid that the hallway will not sustain the load of clothes - it is a very durable, reliable and sustainable piece of furniture. If the item is out of stock, the production time ranges...

SS003713
STOCKHOLM Entrance Hall
27 329

Made of natural wood STOCKHOLM Entrance Hall form Woodville is a comfortable entrance area in the Scandinavian style. The set consists of three items: an open top shelf, panel with hooks and footwear cabinet (STOCKHOLM Footwear Cabinet can be bought separately). The parts of the hallway are not attached to one another, so you can vary the height of hooks and top shelf. A special enamel for wood on water-soluble basis is applied to paint the furniture. If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004700
DORTMUND Clothes Hanger Rail
3 849
4 619

DORTMUND Clothes Hanger Rail If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS002294
LYON 1 Hallway Set
23 239

Comfortable and beautiful LYON 1 Hallway Set will provide a good impression of the house entrance area. Due to optimally chosen size, this item will not occupy much space but provide maximum comfort. The Hallway is equipped with coat hooks, a mirror, three spacious drawers, a shelf for shoes and a small tabletop for small items. The Hallway is made of wood and covered with water-based paint. The dominant colour is white with a faded effect that accentuates the shade of rosewood on some parts (the tabletop, a thin surbase). If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004665
VANCOUVER Entrance Hall
25 299
30 359

VANCOUVER Entrance Hall If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.