SS004886
QUEBEC Coffee Square Table
5 479

QUEBEC Coffee Square Table If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004881
MEXICO CITY Coffee Table
12 679

MEXICO CITY Coffee Table If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004153
HAVANA Coffee Table
3 799
4 559

HAVANA Coffee Table If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS005051
NAGANO Stool
2 529
3 039

NAGANO Stool  is equipped with a wide soft seat. If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004854
OAKLAND Console Sink Stand
19 799

OAKLAND Console Sink Stand If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004853
MONTREAL Wardrobe
28 519

MONTREAL Wardrobe If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004834
BRUGES Wine Cabinet Storage (folds out)
22 179

BRUGES Wine Cabinet Storage (folds out) If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004737
LOFT Bookshelf
1 489
1 789

SS004728
TOKYO Bedside Cabinet
2 769

TOKYO Bedside Cabinet If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004703
TOKIO LOFT Side Table
2 839

TOKIO LOFT Side Table If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004845
BRUGES Writing Desk
16 959

BRUGES Writing Desk If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004787
HELIOS Coffee Table
1 099
1 319

HELIOS Coffee Table If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004533
ISTAMBUL Pouffe
3 189
3 829

ISTAMBUL Pouffe If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004710
GOLDEN Pouffe
1 649
1 979

GOLDEN Pouffe If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004654
IRON Bar Chair
2 529
3 039

IRON Bar Chair If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS005013
NIK Pouffe
879
1 059

NIK Pouffe If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS005019
MONTREAL Chest of Drawers
12 099
14 819

MONTREAL Chest of Drawers If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004648
PRAGUE Water Bottle Stand
2 239

PRAGUE Water Bottle Stand If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004756
EAST INDIES Dining Table
47 519

EAST INDIES Dining Table If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004522
RIGA Dining Table
6 049
7 259

A great solution for restaurants and cafés – a stable and reliable RIGA dining table . The design of the underframe is welded from a pipe by a rectangular section 20x40 mm (legs) and a steel corner 25x25 mm (a frame for a table-top). Thanks to an interesting configuration, the table looks elegant (despite the fact that it is a very durable product), but this is not its only advantage. The legs are placed further away from the edge of the tabletop than in a usual design, so more people can be seated at the table. The tabletop is made of 12 mm thick multilayer plywood, covered with protective tinting impregnation. This material in its practical and decorative qualities is not inferior to wood. If the item is out of stock, the production time ranges from 3 to 20 working...

SS004505
LYON Shoe Cabinet Storage
24 879

Compact LYON Shoe Cabinet will help to maintain order in the entrance area, even if there is not much space. Four boxes are equipped with a special storage system – folding shelves, where you can gently fold shoes, slippers, sneakers and other short-shafted shoes. Thanks to this technological solution, you will avoid cluttering the hallway. Two drawers on metal guides are designed for storing various accessories and shoecare products. The Shoe Cabinet is made of natural wood (pine) and painted with safe water-based paints. The tabletop is impregnated with a toning agent, the colour of which is in harmony with the main light tone. The facade of the cabinet is decorated with a relief geometric pattern and cornices (upper and lower). Boxes are made of plywood. If the item is out...

SS004433
BLACK FOREST Table
15 529

Nature is the unrivalled artist, and this is confirmed by the BLACK FOREST Collection of furniture from Woodville studio. To manufacture it, solid bars of wood are used, with frontal saw cuts 15 cm high. To emphasize the pattern formed by the annual rings, after sanding we fill the cracks and other defects with contrasting black putty and cove the surface with an oil-based protective agent. BLACK FOREST Table is such bars (4 or 8 pieces, depending on the size), laid on a frame made of steel profile pipes (15 x 15 mm, black powder paint). From the bottom, the top is secured by a durable sheet of plywood. If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the...

SS004430
CO-WORKING Table
19 419

Big CO-WORKING Table is convenient in various situations: for collaboration, conducting master classes, and for a large family dinner. Base-frame is made of steel profile of 40 x 60 mm and painted with resistant powder paint. The tabletop is made of durable plywood 18 mm thick. The non-toxic water-based paints were used for its colouring. If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.

SS004415
IRON Rack
15 629

Practical and visually light IRON Rack will help to use space efficiently. Its sleek design is made of steel, making it robust and reliable. Five convenient shelves with boards are made of plywood and are covered with a colourless varnish or a tinted impregnation. The back side of the rack is bound with an openwork metal grid. If the item is out of stock, the production time ranges from 3 to 20 working days (depending on the availability of materials and spare parts). We recommend you to verify the production time of the manager.